(一) 建筑勞務工程計童計算要求
1.項(xiang)目(mu)(mu)部應(ying)督促(cu)承包(bao)班組根據(ju)勞(lao)務(wu)(wu)分包(bao)合同內容,以(yi)任(ren)務(wu)(wu)書(shu)的(de)形(xing)式明確每(mei)名農(nong)民工(gong)或(huo)(huo)每(mei)個(ge)生(sheng)產(chan)班組每(mei)天或(huo)(huo)每(mei)月(yue)(yue)(yue)應(ying)完成的(de)工(gong)作(zuo)量.每(mei)月(yue)(yue)(yue)月(yue)(yue)(yue)底之前(qian),項(xiang)目(mu)(mu)部現場勞(lao)務(wu)(wu)管(guan)理員應(ying)根據(ju)承包(bao)班組出(chu)勤及完成的(de)工(gong)作(zuo)任(ren)務(wu)(wu)量(產(chan)值(zhi)),計算出(chu)班組實際應(ying)得(de)勞(lao)務(wu)(wu)工(gong)程(cheng)款數額(e),報項(xiang)目(mu)(mu)部備案,作(zuo)為農(nong)民工(gong)工(gong)資的(de)支付(fu)依據(ju)。
2.承(cheng)包(bao)(bao)班組進人(ren)施工(gong)(gong)現場(chang)前,應對勞(lao)(lao)(lao)務(wu)分(fen)包(bao)(bao)合(he)同各(ge)項費用(yong)組成進行(xing)分(fen)解(jie),剔(ti)除(chu)輔助(zhu)材料、中(zhong)小(xiao)型工(gong)(gong)具等(deng)相關費用(yong),根據市場(chang)勞(lao)(lao)(lao)務(wu)單價(jia)和農(nong)民(min)(min)工(gong)(gong)本人(ren)技能水平確定每名農(nong)民(min)(min)工(gong)(gong)的(de)工(gong)(gong)日(ri)單價(jia)或應完(wan)成工(gong)(gong)作(zuo)量,做到(dao)項目(mu)部(bu)、勞(lao)(lao)(lao)務(wu)承(cheng)包(bao)(bao)班組長(chang)、農(nong)民(min)(min)工(gong)(gong)三方清楚。
(二) 建筑勞務工資支付要求
1.每(mei)月(yue)底至次月(yue)5日之(zhi)前,項目(mu)部勞(lao)務(wu)(wu)管理員與勞(lao)務(wu)(wu)承(cheng)包(bao)班組負責人(ren)應根據出(chu)勤及完成的工(gong)程量(產值),計算(suan)出(chu)每(mei)名農(nong)(nong)民工(gong)實際應得工(gong)資額,編制工(gong)資支付(fu)表,經項目(mu)部經理、勞(lao)務(wu)(wu)承(cheng)包(bao)班組長(chang)、農(nong)(nong)民工(gong)本人(ren)三(san)方(fang)核查無誤(wu)、簽字(zi)確認后,由(you)項目(mu)部按工(gong)資支付(fu)表將農(nong)(nong)民工(gong)工(gong)資直接以貨幣(bi)形式支付(fu)到農(nong)(nong)民工(gong)本人(ren),勞(lao)務(wu)(wu)承(cheng)包(bao)班組不得截(jie)留(liu)、克(ke)扣(kou)。
2.農(nong)民工(gong)工(gong)資(zi)支付實(shi)行月清月結,即(ji)每(mei)月每(mei)名農(nong)民工(gong)應得工(gong)資(zi)清楚無(wu)爭(zheng)議(yi)。有爭(zheng)議(yi)的,必須在(zai)下(xia)一(yi)月度內(nei)予以解決,不得拖延(yan)。
3.因農(nong)民工隨身攜(xie)帶現金確有困難的,可以通過(guo)協商委(wei)托項目(mu)部到銀行代為辦理工資卡(銀行存折(zhe))。